Provision of Well Head proper sampling point

 

PROJECT INFO

Project start: 2014

Project Completion: 2015

CLIENT INFO

Client: Qatar Gas

SERVICES PROVIDED

Energy and Utility  

PROJECT DETAILS

   To  provide  a  Sample  point  connection  cabinet  at  each injection well head of 50-X3301, 50-X3302 and 50-X3303 for 9, 10 and 16A

sample cabinet (type S1) shall be provided in the Waste Water Disposal (WWD) injection wells 9, 10 and 16A at QG-3&4 to monitor any kind of formation damage and/or corrosion due to waste water. The  sampling  cabinet  type  S1 shall  be  provided  for  low  temperature  non-hazardous  liquid  service.  Pressure regulator  will  be  provided  with  set  pressure  of  1.5  barg,  to  avoid  any consequences  of  potential  high  pressure  at  the  upstream  of  the  sampling point. Since the operating pressure of the well head injection line is of 84.4 barg.