PROJECT INFO
Project start: 2014
Project Completion: 2015
CLIENT INFO
Client: Qatar Gas
SERVICES PROVIDED
Energy and Utility
PROJECT DETAILS
To provide a Sample point connection cabinet at each injection well head of 50-X3301, 50-X3302 and 50-X3303 for 9, 10 and 16A
sample cabinet (type S1) shall be provided in the Waste Water Disposal (WWD) injection wells 9, 10 and 16A at QG-3&4 to monitor any kind of formation damage and/or corrosion due to waste water. The sampling cabinet type S1 shall be provided for low temperature non-hazardous liquid service. Pressure regulator will be provided with set pressure of 1.5 barg, to avoid any consequences of potential high pressure at the upstream of the sampling point. Since the operating pressure of the well head injection line is of 84.4 barg.