PROJECT INFO
Project start: 2014
Project Completion: 2014
CLIENT INFO
Client: Galfar
SERVICES PROVIDED
Energy and Utility
PROJECT DETAILS
To design the Fire Water Ring Main System for Umm Salal Ali Camp as per NFPA 20 standards.
system mainly consist of one (1) electrical driven pump, one (1) Diesel driven fire water pump, one(1) jockey pump , hydrant network & hose reel with hose box. As per requirement the pumps shall be designed for minimum of 90 minutes continuous operation. In order to achieve 90 minutes of operation all the tanks (Fourteen numbers of capacities 5 m3 each) shall be interconnected.