PROJECT INFO
Project start: 2014
Project Completion: 2015
CLIENT INFO
Client: Qatar Petroleum
SERVICES PROVIDED
Energy and Utility
PROJECT DETAILS
EPIC OF 2"" High Pressure Flare Pilot Line at Station A4, Ras Laffan
To Construct a pressure reducing station (PRS) skid, which will reduce the high pressure gas of 72 bar gauge to 1.4 bar gauge (at 40 degrees C). Pressure reduction is to be done in three stages - 72 bar gauge to 25 bar gauge and then 25 bar gauge to 6.89 bar gauge for fine tuning from 6.89 bar gauge to 1.4 bar gauge.
Laying the flare pilot gas line up to Station A4 fence, near the A4 station’s boundary with the BGP.
Installing nitrogen purging connection in the flare header near the flare knockout drum, located near the A4 station’s boundary with the BGP. Nitrogen will be supplied by BGP through flexible hose near the A4 station fence as and when required.
Installing a flare ignition panel (free-issued by QP/Barzan) near flare knockout drum and provision of required electrical and instrument connections to facilitate its operation.
Provision to hookup the thermocouple signals connected to the flare ignition panel in the existing PLC/SCADA System.
Interfacing the instrumentation, hardwire I/Os and establish communications with the existing SCADA through an existing intermediate PLC.
t