PROJECT INFO
Project start: 2017
Project Completion: 2017
CLIENT INFO
Client: City Petrol Station
SERVICES PROVIDED
Environmental
PROJECT DETAILS
City Petrol Station (CPS) project is refurbishment of the petrol station, which includes removal of underground fuel (Super and Diesel) storage tanks, in situ clean-up of underground fuel (Premium) storage tanks, placement of new PSEC compliant underground storage tanks, and replacement of fuel dispensers.
CPS management has retained the services of Qatar Design Consortium (QDC) to carry out the baseline environmental study and prepare an Environmental Impact Assessment (EIA) study report. In order to relate the existing environment with the proposed project activity, it was imperative to carry out detail evaluation of the baseline environmental characteristics including: Ambient air Quality, Noise Level, Soil Quality, and Groundwater quality. Identify the significant aspect and impact magnitude on the surrounding including any on relevant sensitive receptor. And applicable regulatory requirements were reviewed and compiled before commencing a structured and detailed baseline studies and a refined modelling analysis has been conducted using AERMOD. Also a Construction Environmental Management (CEMP) and framework document for Operation Phase including the environmental monitoring and reporting were provided.