PROJECT INFO
Project start: 2014
Project Completion: 2015
CLIENT INFO
Client: Qatar Gas
SERVICES PROVIDED
Process Piping & Stress Analysis
PROJECT DETAILS
Design and detailed engineerings services for
- PROJECT 1 – Provision of sample return line to flare header in QG1 SRU 1&2 and gas calibration system
- PROJECT 2- Provision of Nitrogen Purging Point with Flexible hose at loading arm (07L-7101 A/B/D) Berth-1.
- PROJECT 3 - Installation of a new Vaporizer for Jetty Flare pilot (08-E8401) at LNG Jetty-1
- PROJECT 4- Replacement of existing flexible hose (Fuel Gas Feed) to burners in stripper Re-Boiler H-8100/H-8200/H-8300 in QG1 upstream.
- PROJECT 5 – Re-position the displaced AGE steam condensate line SC-038-10” distributing into Train 1 &2 Header SC-1309-8” and SC-2309-8” into its initial design position including fabrication and installation of the modified support stopper.
- PROJECT 6 – Accumulation of water in the local control panel of the Seal Gas skid control panel of the gas turbines KT601/2/3 and 4 for the QG1.
- PROJECT 7 – Provision of Utility Station Nitrogen Service at X-0912 platform in AGE unit 1&2
- PROJECT 8 – Provision of Utility Station Steam Service at SDV-0912 platform in AGE unit 1&2
- PROJECT 9 – Provision of a proper sampling connection for Helium in QG-1 (Train 1 2, 3).