NINE COMBINED EPC PROJECTS

NINE COMBINED EPC PROJECTS
NINE COMBINED EPC PROJECTS

 

PROJECT INFO

Project start: 2014

Project Completion: 2015

CLIENT INFO

Client: Qatar Gas

SERVICES PROVIDED

Process  Piping & Stress Analysis  

PROJECT DETAILS

Design and detailed engineerings services for

  • PROJECT 1 – Provision of sample return line to flare header in QG1 SRU 1&2 and gas calibration system
  • PROJECT 2- Provision of Nitrogen Purging Point with Flexible hose at loading arm (07L-7101 A/B/D) Berth-1.
  • PROJECT 3 - Installation of a new Vaporizer for Jetty Flare pilot (08-E8401) at LNG Jetty-1
  • PROJECT 4- Replacement of existing flexible hose (Fuel Gas Feed) to burners in stripper Re-Boiler H-8100/H-8200/H-8300 in QG1 upstream.
  • PROJECT 5 – Re-position the displaced AGE steam condensate line SC-038-10” distributing into Train 1 &2 Header SC-1309-8” and SC-2309-8” into its initial design position including fabrication and installation of the modified support stopper.
  • PROJECT 6 – Accumulation of water in the local control panel of the Seal Gas skid control panel of the gas turbines KT601/2/3 and 4 for the QG1.
  • PROJECT 7 – Provision of Utility Station Nitrogen Service at X-0912 platform in AGE unit 1&2
  • PROJECT 8 – Provision of Utility Station Steam Service at SDV-0912 platform in AGE unit 1&2
  • PROJECT 9 – Provision of a proper sampling connection for Helium in QG-1 (Train 1 2, 3).