FEED FOR WATER CONTROL AT HALUL ISLAND

FEED FOR WATER CONTROL AT HALUL ISLAND
FEED FOR WATER CONTROL AT HALUL ISLAND
FEED FOR WATER CONTROL AT HALUL ISLAND

 

PROJECT INFO

Project start: 2017

Project Completion: 2018

CLIENT INFO

Client: QatarEnergy

SERVICES PROVIDED

Structural  Process  Piping & Stress Analysis  Instrumentation/Automation  Loss Prevention  

PROJECT DETAILS

Many areas on Halul Island have experienced settlement and land subsidence such as cracks, erosion pits, sinkholes and ground settlement due to mineral dissolution, or karst, of the Hormuz rocks. M/s Fugro recommendation is to introduce measures to control surface water, site drainage, erosion and subsurface impervious “low permeability barriers". The objective of this CONTRACT is to carryout Front-End Engineering Design (FEED) and related works for entire Halul Island for:

(a) Storm/ surface water drainage network

(b) Potable water network

(c) Irrigation water network