PROJECT INFO
Project start: 2017
Project Completion: 2022
CLIENT INFO
Client: QatarEnergy
SERVICES PROVIDED
Structural Energy and Utility Process Piping & Stress Analysis Instrumentation/Automation Loss Prevention
PROJECT DETAILS
Frame agreement for Engineering Services for various Offshore locations (PS2, PS3, HALUL, Al-Rayyan Field, ISND, ISSD fields)
Engineering Consultancy Services (ECS) for Plant Change request (PCR) and Miscellaneous Engineering Support Services, From time to time problems requiring technical advice/engineering studies or improvement are identified for further detailed study for changes or extensions to the existing systems.
i) Front End Engineering Design (FEED),
ii) Technical studies and/or conceptual designs,
iii) Detailed design,