PROJECT INFO
Project start: 2017
Project Completion: 2017
CLIENT INFO
Client: Aziz Petrol Station
SERVICES PROVIDED
Environmental
PROJECT DETAILS
The management of Aziz Petrol Station (APS) proposed to undergo refurbishment which included removal of underground fuel storage tanks, placement of new PSEC compliant underground storage tanks, replacement of fuel dispensers, demolition of Fuel Station Canopy and decommissioning of Exiting Doha Bank ATM.
APS management has retained the services of Qatar Design Consortium (QDC) to carry out the baseline environmental study and prepare an Environmental Impact Assessment (EIA) study report. In order to relate the existing environment with the proposed project activity, it was imperative to carry out detail evaluation of the baseline environmental characteristics including: Ambient air Quality, Noise Level, Soil Quality, and Groundwater quality. Identify the significant aspect and impact magnitude on the surrounding including any on relevant sensitive receptor. And applicable regulatory requirements were reviewed and compiled before commencing a structured and detailed baseline studies and a refined modelling analysis has been conducted using AERMOD.